Nevada data center growth drives approval of temporary gas plants
Two temporary gas plants providing 362 megawatts of power have been approved in northern Nevada. The project aims to support energy infrastructure strained by local data center growth.
The two plants will provide 362 megawatts of power as data center growth puts increasing pressure on northern Nevada’s energy infrastructure.
READ NEXT
More on the wire
AI TLDR
The Las Vegas diocese is preparing for the beatification of Archbishop Fulton J. Sheen, a significant step toward sainthood. Tens of thousands are expected to attend the upcoming Mass.
AI TLDR
Residents of the historic Rancho Circle neighborhood in Las Vegas are protesting a new high-end development. Approximately 75 neighbors attended a town hall meeting at City Hall to voice their concerns.
AI TLDR
A 25-year-old Las Vegas man is facing open murder and other charges following the fatal shooting of his neighbor.